[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
اصول اخلاق نشریه::
اصول اخلاق نشریه::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: Volume 9, Issue 39 (Winter 2014 2014) ::
QEER 2014, 9(39): 171-198 Back to browse issues page
Feasibility Study of Using from the Energy Recovery of Energy Losses in Parand Power Plant
M. ElhamBakhsh * 1, Kh. Bakhtari1 , A. Ataiee1
1- Azad University
Abstract:   (12095 Views)
!mso]>

Feasibility Study of Using from the Energy Recovery of Energy Losses in Parand Power Plant

K. Bakhtari

Assistant Professor, Faculty of Energy & Environmental, Islamic Azad University, Science and Research Branch,

 A. Ataei

Assistant Professor, Faculty of Energy & Environmental, Islamic Azad University, Science and Research Branch,

 M. Elhambakhsh

MSc Student in Energy Systems Engineering, Energy & Environmental Faculty, Islamic Azad University, Science and Research Branch, melhambakhsh@yahoo.com

 M. Sharif

IFCO Company, NIOC

 R. Danesfaleh

IFCO Company, NIOC

Received: 2012/06/24  Accepted: 2013/05/19

 

Abstract

This research is a model of CHP system which used energy for Parand City, produced by Gas Turbine from Parand power plant. At first, the structures are simulated base on the type of materials and the usage of structures by data gathering & simulation software such as HAP, Carrier & E-Quest software. Subsequently the Thermal Energy consumption for the City is estimated. And optimization point for production of energy is found.

Retrievable energy potential from Power Plant Gas Turbines is obtained by Thermo-flow software. Then with respect to the retrievable energy potential & average demand of Thermal energy usage of City, the steam produced capacity from simulation of HRSG by Thermo-flex is calculated. Finally, the project is economically evaluated by excel software.

JELClassification: Q42, O33, O22, L95,L94 ,C88

Keywords: CHP System , Thermo-Flow Software, Retrievable Energy Potential, Power Plant Gas Turbines



Normal 0 false false false EN-US X-NONE AR-SA
Keywords: CHP System, Thermo-Flow Software, Retrievable Energy Potential, Power Plant Gas Turbines
Full-Text [PDF 922 kb]   (2194 Downloads)    
Type of Study: Research | Subject: Energy Economic
Received: 2012/06/25 | Accepted: 2013/05/19 | Published: 2014/02/17 | ePublished: 2014/02/17
Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

ElhamBakhsh M, Bakhtari K, Ataiee A. Feasibility Study of Using from the Energy Recovery of Energy Losses in Parand Power Plant . QEER 2014; 9 (39) :171-198
URL: http://iiesj.ir/article-1-343-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 9, Issue 39 (Winter 2014 2014) Back to browse issues page
فصلنامه مطالعات اقتصاد انرژی Quarterly Energy Economics Review
Persian site map - English site map - Created in 0.05 seconds with 37 queries by YEKTAWEB 4645