Feasibility Study of Using from the
Energy Recovery of Energy Losses in Parand Power Plant
K. Bakhtari
Assistant Professor,
Faculty of Energy & Environmental, Islamic Azad University, Science and
Research Branch,
A.
Ataei
Assistant Professor, Faculty
of Energy & Environmental, Islamic Azad University, Science and Research
Branch,
M. Elhambakhsh
MSc Student in Energy
Systems Engineering, Energy & Environmental Faculty, Islamic Azad University,
Science and Research Branch, melhambakhsh@yahoo.com
M.
Sharif
IFCO Company, NIOC
R. Danesfaleh
IFCO Company, NIOC
Received: 2012/06/24 Accepted: 2013/05/19
Abstract
This research is a model of CHP system which used energy for Parand
City, produced by Gas Turbine from Parand power plant. At first, the structures
are simulated base on the type of materials and the usage of structures by data
gathering & simulation software such as HAP, Carrier & E-Quest
software. Subsequently the Thermal Energy consumption for the City is
estimated. And optimization point for production of energy is found.
Retrievable energy potential
from Power Plant Gas Turbines is obtained by Thermo-flow software. Then with
respect to the retrievable energy potential & average demand of Thermal
energy usage of City, the steam produced capacity from simulation of HRSG by
Thermo-flex is calculated. Finally, the project is economically evaluated by excel software.
JELClassification: Q42, O33, O22,
L95,L94 ,C88
Keywords: CHP System ,
Thermo-Flow Software, Retrievable Energy Potential, Power Plant Gas Turbines